Planning Application

If the application has not been determined you can use the Yellow 'Comment on Application' button to make representations.

For information click links below:

Plans, documents and other information that forms part of the application is attached at the bottom of the page.


Application Details
Reference number RM/2020/2519 Application Description Planning Application (Reserved Matters)
Coventry Reference
Site Address Whitley South - Land to the north and south of the A45 (between the Festival and Tollbar junctions)
and land at the junctions of the A45/Festival Roundabout and the A46/Tollbar Roundabout
A45
and the junctions of the A444 with the A4114/Whitley. Roundabout

CV3 6RQ
Proposal Approval of reserved matters (to include access, appearance, landscape, layout and scalefor detailed approval of appearance, landscaping, layout and scale) for Zone 3 of the approved development comprising a new office building imposed on application reference S73/2017/2186 (variation of OUT/2016/0405) granted on 11th December 2017 for comprehensive development of Whitley South.
Application Status Recommendation entered - Pending decision
Received Date 09/10/2020 Valid date 09/10/2020 Decision expected Date 04/12/2020
Case Officer Darren Henry
End of Public Consultation Period 17/11/2020
Referred to Secretary of State
Decision level Delegated Committee Date
Decision PENDING Decision Date
Temp Permission Expiry Date Permission Expiry Date
Agent Name
Oxalis Planning
Images
Application Form
General Arrangement
Vehicle Tracking and Visibility Splays
Design and Access Statement
Drainage Catchments
Drainage Strategy Sheet 1
Drainage Strategy Sheet 2
Drainage and Flood Risk Assessment Statement
Cross Sections
Longsections Sheet 1
Longsections Sheet 2
Landscape Proposals
Proposed Soft Landscaping Maintenance
Lighting Layout
Planning Statement
Location Plan
Site Location Plan
Site Layout Plan
Floor Plans
Elevations
External Materials
Consultation Response Highways 10.11.2020
Consultation Response Ecology 10.11.2020
Consultation Response EP 10.11.2020
Consultation Response - Lead Local Flood 13.11.2020
Consultation Response -UD - 16.11.2020
Supersed--Electric Charging Points
Cycle Shelter
Illustrative Site Plan
Consultation Response--Highways Objection 2
Amended--Electric Charging Points Layout Plan

Print this page