Application Details
Reference number FUL/2018/2651 Application Description Full Planning Application (Major)
Coventry Reference
Site Address Land off
De Montfort Way

Coventry
CV4 7EH
Proposal Redevelopment of the existing car park to provide a new student accommodation building and associated amenities, a new multi-storey car park, landscaping enhancements, new pedestrian crossing and other public realm improvements.
Application Status Recommendation entered - Pending decision
Received Date 19/09/2018 Valid date 19/09/2018 Decision expected Date 19/12/2018
Case Officer Mary-Ann Jones
End of Public Consultation Period 19/01/2019
Referred to Secretary of State
Decision level Planning Committee Committee Date 14/02/2019
Decision PENDING Decision Date
Temp Permission Expiry Date Permission Expiry Date
Agent Name
Lichfields
Images
Drawing: Proposed View 07 DWG: U208-P30
Drawing: Proposed View 06 DWG: U208 - P29
Drawing: Proposed View 05 DWG: U208 - P28
Drawing: Proposed View 04 DWG: U208 - P27
Drawing: Proposed View 03 DWG: U208 - P26
Drawing: Proposed View 02 DWG: U208 - P25
Drawing: Proposed View 01 DWG: U208 - P24
Drawing: Proposed Facade Detail DWG: U208 - P23
SUPERSEDED: Proposed Sectional Elevation 04. DWG: U208 - P22
SUPERSEDED: Proposed Sectional Elevation 03 DWG: U208 - P21
SUPERSEDED: Proposed Sectional Elevation 02 DWG: U208 - P20
SUPERSEDED: Proposed Sectional Elevation 01 DWG: U208 - P19
SUPERSEDED: Proposed St Joseph The Worker Elevation DWG: U208 - P18
SUPERSEDED: Proposed Canley Garden Cemetery Elevation DWG: U208 - P17
SUPERSEDED: Proposed Squires Way Elevation DWG: U208 - P16
SUPERSEDED: Proposed De Montfort Way Elevation in Context DWG: U208 - P15
SUPERSEDED: Proposed De Montfort Way Elevation DWG: U208 - P14
Proposed Roof Plan DWG: U208 - P13
SUPERSEDED: Proposed Level 5 Plan DWG: U208 - P12
SUPERSEDED: Proposed Level 4 Plan DWG: U208 - P11
SUPERSEDED: Proposed Level 3 Plan DWG: U208 - P10
SUPERSEDED: Proposed Level 2 Plan DWG: U208 - P09
SUPERSEDED: Proposed Level 1 Plan DWG: U208 - P08
SUPERSEDED: Proposed Level 0 Plan DWG: U208 - P07
SUPERSEDED: Proposed Site Plan DWG: U208 - P06
Drawing: Existing Site Sections 02 DWG: U208 - P05
Drawing: Existing Site Sections 01 DWG: U208 - P04
Drawing: Existing Block Plan DWG: U208 - P03
Drawing: Topographical Survey DWG: U208 - P02
Drawing: Site Location Plan DWG: U208 - P01
Document: Transport Statement
Document: Tree Survey prepared by Arbtech, dated 25/07/2018
Document: Framework travel plan, prepared by WYG. Ref: A108552. Dated September 2018;
Document: Student Management Plan 13.09.18_Part_2
Document: Student Management Plan 13.09.18 Part 1
Document: Soft Landscape Design Statement
Document: Preliminary Ecological Appraisal v2 Dated 10/09/2018
Document: Lighting Impact Assessment
Document: Landscape Management and Maintenance Plan - 13.09.18_Part_2
Document: Landscape Management and Maintenance Plan - 13.09.18_Part_1
Document: Non-Residential Mining Report prepared by the coal authority, ref; 51001919700001
Document: Express Preliminary UXO Risk Assessment prepared by 1st Line Defence dated 07/09/2018
Document: Ground Conditions Report, prepared by Ian Black consulting. dated - 13.09.18 Part_2
Document: Ground Conditions Report, prepared by Ian Black consulting. dated - 13.09.18_Part_1.
Document: Environmental Noise Survey prepared by Adnitt acoustic, ref: E18017/ENS/R1-A;
Document: Energy Statement - 12.09.18
SUPERSEDED Document: Drainage Report - 13.09.18
Document: Archaeological Desk Based Assessment, prepared by Allan Archaeology ref: AAL 2018089. dated Sept 2018
Document: Covering Letter
Document: Design and Access Statement Sept 18 (Part 21)
Document: Design and Access Statement Sept 18 (Part 20)
Document: Design and Access Statement Sept 18 (Part 19)
Document: Design and Access Statement Sept 18 (Part 18)
Document: Design and Access Statement Sept 18 (Part 17)
Document: Design and Access Statement Sept 18 (Part 16)
Document: Design and Access Statement Sept 18 (Part 15)
Document: Design and Access Statement Sept 18 (Part 14)
Document: Design and Access Statement Sept 18 (Part 13)
Document: Design and Access Statement Sept 18 (Part 12)
Document: Design and Access Statement Sept 18 (Part 11)
Document: Design and Access Statement Sept 18 (Part 10).
Document: Design and Access Statement Sept 18 (Part 09).
Document: Design and Access Statement Sept 18 (Part 08).
Document: Design and Access Statement Sept 18 (Part 07)
Document: Design and Access Statement Sept 18 (Part 06)
Document: Design and Access Statement Sept 18 (Part 05).
Document: Design and Access Statement Sept 18 (Part 04).
Document: Design and Access Statement Sept 18 (Part 03)
Document: Design and Access Statement Sept 18 (Part 02)
Document: Design and Access Statement Sept 18 (Part 01)
SUPERSEDED Document: Biodiveristy Impact Assessment V1
Application Form
SUPERSEDED: Landscape Planting Plan DWG: 6290-L-102_RevA
SUPERSEDED: Proposed Landscape General Arrangement DWG: 6290-L-100_RevA
Document: Indicative Scheme Visualisations
Document: Planning Statement Part 2
Document: Planning Statement Part 1
Document: Planning Statement Part 3
Press Notice 04.10.18
Document: Drainage report V1.1 received 15/10/18
Document: Air Quality Assessment. Ref J3471A/1/F1 dated 23 October 2018
Document: Biodiversity Impact Assessment V2.0 dated 15/11/2018
Drawing: U208 - P31 Proposed Site Plan - Construction Phasing
SUPERSEDED: 6290-L-101_RevB_Tree Constraints Plan
SUPERSEDED: 6290-L-100 Landscape Proposals REV C
SUPERSEDED: 6290-L-101 Tree Constraints Plan Rev C
SUPERSEDED: 6290-L-102 Landscape Planting Plan Rev C
SUPERSEDED: 6290-L-103 Landscape Section A - C REV B
SUPERSEDED: 6290-L-104 General Arrangement Green Walls
New document: 16339 - Cannon Park Amendment Letter from agent, dated 08.01.19 - SUMMARY OF AMENDMENTS
New document: Air Quality - Technical Note
New document: Cannon Park Addendum to Design and Access Statement Dec 18 Planning Submission Addendum
New drawing: Car Park Phasing Plans
New document: Hill Cannon Statement re - car park (Car park - car park statement, prepared by Hill cannon)
New document: Landscape Response to Tree Officer Comments
New document: Transport Techincal Note.
SUPERSEDED: U208 - P06_A Proposed Site Plan
SUPERSEDED: U208 - P07_A Proposed Level 0 Plan
SUPERSEDED: U208 - P08_A Proposed Level 1 Plan
SUPERSEDED: U208 - P09_A Proposed Level 2 Plan
SUPERSEDED: U208 - P10_A Proposed Level 3 Plan
SUPERSEDED: U208 - P11_A Proposed Level 4 Plan
SUPERSEDED: U208 - P12_A Proposed Level 5 Plan
SUPERSEDED: U208 - P13_A Proposed Roof Plan
New drawing: U208 P14 A - Proposed De Montfort Way Elevation
New drawing: U208 P15 A - Proposed De Montfort Way Elevation in Context
New drawing: U208 P16 A - Proposed Squires Way Elevation
New drawing: \U208 P17 A - Proposed Canley Garden Cemetery Elevation.
New drawing: U208 P18 A - Proposed St Joseph The Worker Elevation
New drawing: U208 P19 A - Proposed Sectional Elevation 01
New drawing: U208 P20 A - Proposed Sectional Elevation 02
New drawing: U208 P21 A - Proposed Sectional Elevation 03
New drawing: U208 P22 A - Proposed Sectional Elevation 04
New drawing: U208 P32 A - Proposed Large Scale Details - De Montfort Way Elevation
New drawing: U208 P33 - Proposed Large Scale Details - Details of Projecting Boxes
New drawing: U208 P34 - Proposed Large Scale Details - Details of Brick Projections
New drawing: U208 P35 A - Proposed Large Scale Details - Balcony Detail and ManSafe
New document: Updated Soft Landscape Design Statement
Returned Neighbour Letters
Returned Neighbour Letters
New drawing: 6290-L-100 Landscape Proposals_RevD
New drawing: 6290-L-101 Tree Constraints Plan_RevD
New drawing: 6290-L-102 Landscape Planting Plan_Rev D
New drawing: 6290-L-103 Landscape Section A - C REV B
New drawing: 6290-L-104 General Arrangement Green Walls_RevA
New document:Dry Riser Provisions Technical Note_210119_Rev.01
New drawing: U208 - P07_B Proposed Level 0 Plan
New drawing: Proposed Site Plan Dwg: U208 P06 Rev B
New drawing: Proposed Level 1 Plan Dwg: U208 - P08 Rev B
New drawing: Proposed Level 2 Plan Dwg: U208 - P09 Rev B
New drawing: Proposed Level 3 Plan Dwg: U208 - P10 Rev B
New drawing: Proposed Level 4 Plan Dwg: U208 - P11 Rev B
New drawing: Proposed Level 5 Plan Dwg: U208 - P12 Rev B
New drawing: Proposed Roof Plan Dwg: U208 - P13 Rev B
Planning Committee Final Report dated 14.02.2019
CGI booklet
Planning Committee Powerpoint Presentation dated 14th Feb 2019
Late Representations - 14 February 19