Planning Application

If the application has not been determined you can use the 'Comment on Application' button to make representations.

For information on making comments, how we use them and advice on the Planning Committee process then click on the following link how to comment.

For advice on submitting a petition then please click on the following link Petitions.

Plans, documents and other information that forms part of the application is attached at the bottom of the page.


Application Details
Reference number FUL/2018/2063 Application Description Full Planning Application (Major)
Coventry Reference
Site Address University Hospital
Clifford Bridge Road

Coventry
CV2 2DX
Proposal Change of use from grass farmland to surface car park for hospital staff use, providing 1600 car parking spaces (including 34 active Electric Vehicle charging spaces and 46 passive charging spaces), 34 motorcycle parking spaces and 160 bicycle parking spaces, with associated landscaping, lighting and car parking equipment, and new substation, with new time-controlled vehicle exit to Farber Road (for use by Car Park A only (capacity 565 spaces), between 4.00pm - 8.30pm).
Application Status Recommendation entered - Pending decision
Received Date 17/07/2018 Valid date 19/07/2018 Decision expected Date 18/10/2018
Case Officer Liam D'Onofrio
End of Public Consultation Period 17/08/2018
Referred to Secretary of State
Decision level Delegated Committee Date
Decision PENDING Decision Date
Temp Permission Expiry Date Permission Expiry Date
Agent Name
Stripe Consulting Ltd
Images
UKPN Flat Roof Substation
Design and access statement
The Strada Series PG.
The Duro Series PG
Automatic Traffic Count Surveys
Traffic Flow Diagrams
Queue Surveys
Junction Counts
Swept Path Analysis
Swept Path Analysis
Parking Surveys
Scoping Report
Active Travel Plan
ARCADY & PICADY Analysis
Linsig Analysis
SUPERSEDED Transport Assessment
Suilvision ANPR Bollard Plus
STATEMENT OF COMMUNITY INVOLVEMENT
Report BS5837 Cov Uni Hosp
Speedgate Detail
Site Plan (lower section)
Site_Plan_91202_P3 (central section)
Site_Plan_91201_P5 (upper section)
Cycle Canopy Detail_30002_P1
Cycle Canopy Detail_30001_P1
Bridge_Detail_30004_P1
Boundary Treatment_Plan_91204_P4
Block_Plan_91002_P7
Automatic Barrier
Packaged Lighting Solutions Lighting Scheme UHCW 15lux
Location Plan_10001_P5
Active Travel Plan v2
Geological Report
Coal Mining Report
Datasheet
Environmental Data
OS plans
Master Plans
GI_Pt3
GI_Pt2
GI_Pt17
GI_Pt16.
GI_Pt15
GI_Pt14.
GI_Pt13
GI_Pt12
GI_Pt11
GI_Pt10
GI_Pt1
Hard Landscaping Construction Details
Drainage Construction Details Sheet 2 of 3
Drainage Construction Details Sheet 1 of 3
External Levels Sheet 5 of 5
External Levels Sheet 4 of 5.
External Levels Sheet 3 of 5
External Levels Sheet 2 of 5
External Levels Sheet 1 of 5
Hard Landscaping Sheet 5 of 5
Hard Landscaping Sheet 4 of 5
Hard Landscaping Sheet 3 of 5
Hard Landscaping Sheet 2 of 5
P3 Hard Landscaping Sheet 1 of 5
Pond Cross Sections
Drainage Construction Details Sheet 3 of 3
Drainage Strategy Sheet 5 of 5
Drainage Strategy Sheet 4 of 5.
Drainage Strategy Sheet 3 of 5
Drainage Strategy Sheet 2 of 5
Drainage Strategy Sheet 1 of 5
Windes Calculation for Storm Network 2
Windes Calculation for Storm Network 2
Windes Calculation for Storm Network 1
Windes Calculation for Storm Network
Calculations
EX_Site_Plan_91103_P4
EX_Site_Plan_91102_P3
EX_Site_Plan_91101_P4
EX_Block_Plan_91001_P4
Efaflex High Speed Turbo Door.
Drainage Strategy FRA V3.0_Part4
Drainage Strategy FRA V3.0_Part3
Drainage Strategy FRA V3.0_Part2
Drainage Strategy FRA V3.0_Part1
Broxap_coventry-gullwing-cycle-shelter
Summary
Application Form
Cover Letter
Plant Maintenance Schedule Coventry Hospital Rev 1 - 29.6.18
Plant Schedule Coventry Hospital Rev 1 - 29.6.18
4. Stripe Coventry Planting Beds 34-41 Rev 29.6.18
3. Stripe Coventry Planting Beds 17-33 Rev 29.6.18
2. Stripe Coventry Planting Beds 1-16 Rev 29.6.18
Preliminary_Ecological_Appraisal_Rev0.
1. Stripe Coventry car park - Landscape Layout Rev 1 - 28.6.18.
Portal Email
Consultation Response Drainage 17.08.18
Press notices - 2.8.18
Tree Protection Plan and Hazard Survey
Transport Assessment Addedum
Noise Impact Assessment
Surface Water Attenuation Report

Print this page