Planning Application

If the application has not been determined you can use the 'Comment on Application' button to make representations.

For information on making comments, how we use them and advice on the Planning Committee process then click on the following link how to comment.

For advice on submitting a petition then please click on the following link Petitions.

Plans, documents and other information that forms part of the application is attached at the bottom of the page.


Application Details
Reference number FUL/2018/1732 Application Description Full Planning Application (Major)
Coventry Reference
Site Address Coventry Railway Station
Station Square

Coventry
CV1 2GT
Proposal Construction of a new station building, providing a second entrance at the western end of the station, including passenger facilities (including waiting area and seating, retail/ cafe kiosk concessions, WCs, baby changing facilities), pedestrian lift access between concourse levels, staff welfare facilities, with associated lighting, soft and hard landscaping, services and boundary treatment. Construction of; new and temporary roads; and a new 634-space multi-storey car park.
Application Status FAPP
Received Date 21/06/2018 Valid date 29/06/2018 Decision expected Date 28/09/2018
Case Officer Nigel Smith
End of Public Consultation Period 18/09/2018
Referred to Secretary of State
Decision level Planning Committee Committee Date 15/11/2018
Decision APPROVED Decision Date 16/11/2018
Temp Permission Expiry Date Permission Expiry Date 14/11/2021
Agent Name
SLC Property Ltd
Images
Fee Calculation
Attachment Summary
Application Form
Portal Email
Planning Statement
Cover Letter
Sustainability Statement
Article 13
Transport Assessment
Heritage Statement v1
Preliminary Ecological Appraisal
Outline Construction Phasing and Methodology
Location Plan DWG:CSG4-D5A-MB-00-DR-A-0001 P01
Existing Site Plan DWG:CSG4-D5A-MB-00-DR-A-0002 P01
Proposed Site Plan DWG:CSG4-D5A-MB-00-DR-A-0003 P02
Existing Ground Floor Plan DWG:CSG4-D5A-MB-00-DR-A-0007 P01
Proposed GA Plan Level 0 DWG:CSG4-D5A-MB-00-DR-A-0008 P01
Existing Block Plan DWG:CSG4-D5A-MB-00-DR-A-0009 P01
Proposed Block Plan DWG:CSG4-D5A-MB-00-DR-A-0010 P01
Reflected Ceiling Plan Level 0 DWG:CSG4-D5A-MB-00-DR-A-0011 P01
Demolitions Plan DWG:CSG4-D5A-MB-00-DR-A-0012 P01
Proposed GA Plan Level 1 DWG:CSG4-D5A-MB-01-DR-A-0001 P01
Reflected Ceiling Plan Level 1 DWG:CSG4-D5A-MB-01-DR-A-0002 P01
Proposed GA Plan Level 2 DWG:CSG4-D5A-MB-02-DR-A-0001 P01
Proposed GA Plan Level 3 DWG:CSG4-D5A-MB-03-DR-A-0001 P01
Proposed GA Plan Level 4 DWG:CSG4-D5A-MB-04-DR-A-0001 P01
Proposed GA Plan Level 5 DWG:CSG4-D5A-MB-05-DR-A-0001 P01
Proposed GA Plan Level 6 DWG:CSG4-D5A-MB-06-DR-A-0001 P01
Proposed GA Plan Level 7 DWG:CSG4-D5A-MB-07-DR-A-0001 P01
Proposed GA Plan Level 8 DWG:CSG4-D5A-MB-08-DR-A-0001 P01
Proposed GA Plan Roof DWG:CSG4-D5A-MB-RF-DR-A-0001 P01
Visualisations DWG:CSG4-D5A-MB-XX-DR-A-0001 P01
Design and Access Statement
Elevations DWG:CSG4-D5A-MB-ZZ-DR-A-0001 P01
Elevations DWG:CSG4-D5A-MB-ZZ-DR-A-0002 P01
Existing Elevations DWG:CSG4-D5A-MB-ZZ-DR-A-0003 P01
Existing Elevations DWG:CSG4-D5A-MB-ZZ-DR-A-0004 P01
Site Sections DWG:CSG4-D5A-MB-ZZ-DR-A-0005 P01
Interface Elevation DWG:CSG4-D5A-MB-ZZ-DR-A-0006 P01
Footbridge Threshold Plan DWG:CSG4-D5A-MB-ZZ-DR-A-0007 P01
Footbridge Threshold Section DWG:CSG4-D5A-MB-ZZ-DR-A-0008 P01
Railing Detail DWG:CSG4-D5A-MB-ZZ-DR-A-0009 P01
Footbridge Access Steps DWG:CSG4-D5A-MB-ZZ-DR-A-0010 P01
Contaminated Land Statement Rev 04
Detailed Arrangement DWG:CSG4-WSP-MB-GF-DR-L-0001 P02
Existing Station Retained and Proposed Paving DWG:CSG4-WSP-MB-GF-DR-L-0002 P01
Existing Station Retained and Removed Paving DWG:CSG4-WSP-MB-GF-DR-L-0003 P01
Cross Sections DWG:CSG4-WSP-MB-GF-DR-L-0201 P01
Station Building Utilities Assessment
General Arrangement - Planting Plan DWG:CSG4-WSP-ZZ-GF-DR-L-0021 P02
Hard Landscape Plan DWG:CSG4-WSP-ZZ-GF-DR-L-0031 P02
Typical Planting Details - Areas of Soft Landscape DWG:CSG4-WSP-ZZ-GF-DR-L-0221 P01
Typical Tree Planting Details in Areas of Hard Landscape DWG:CSG4-WSP-ZZ-GF-DR-L-0222 P01
Typical Paving Details DWG:CSG4-WSP-ZZ-GF-DR-L-0231 P01
Typical Paving Details Tactiles DWG:CSG4-WSP-ZZ-GF-DR-L-0232 P01
Typical Bollard Detail DWG:CSG4-WSP-ZZ-GF-DR-L-0241 P01
Typical Seating Detail DWG:CSG4-WSP-ZZ-GF-DR-L-0242 P01
Typical Wayfinding Totem Detail DWG:CSG4-WSP-ZZ-GF-DR-L-0243 P01
UXO Desk Study
Notice Under Article 13
Consultation Responses
Returned Neighbour Letters
Consultation Response-WMFS-14.08.18
Press notices - 19.7.18
Consultation response Highways 6.9.18.
Consultation Responses - Severn Trent - 12.09.18
TA addendum dated October 2018
Planning Committee Final Report Dated 15.11.2018
Planning Committee Presentation 15.11.18
Late Representations - 15 November 18
decision notice
Site Notice
Worksheet

Print this page