Planning Application

If the application has not been determined you can use the 'Comment on Application' button to make representations.

For information on making comments, how we use them and advice on the Planning Committee process then click on the following link how to comment.

For advice on submitting a petition then please click on the following link Petitions.

Plans, documents and other information that forms part of the application is attached at the bottom of the page.


Application Details
Reference number FUL/2017/2993 Application Description Full Planning Application (Major)
Coventry Reference
Site Address 1 The Oaks
Westwood Way
Westwood Business Park
Coventry
CV4 8JB
Proposal Demolition of existing building and erection of student accommodation, car parking, landscaping and associated works
Application Status Consultations/Re-consultations issued
Received Date 24/11/2017 Valid date 28/11/2017
Determination Required Date 27/02/2018
Case Officer Nigel Smith Case Officer Site Visit Date
Start of Public Consultation Period 06/12/2017 End of Public Consultation Period 28/12/2017
Referred to Secretary of State Date Referral Expiry Date
Decision by Delegated Committee Date
Decision PENDING Decision Date
Temp Permission Expiry Date Permission Expiry Date
Legal Obligation
Applicant Name
McLaren (The Oaks) Limited
Agent Name Paul Rouse
Savills (UK) Limited
Applicant Address Curzon Street
London
W1J 5JA
Agent Address Innovation Court
121
Birmingham
B3 2HJ
Images
Application Form
A summary of the attachments in the proposal
Landscape Design Statement November 2017
Arboricultural Implications Assessment November 2017
Courtyard Image 1
Courtyard Image 2
Letter from agent dated 24.11.17
Entrance Image
Existing floor plans Dwg 001
How the fee was calculated
Westwood Way image
Management Plan November 2017
Planning Statement November 2017
Drainage Strategy Statement November 2017
Extended Phase 1 Habitat Survey and Bat Roost Potential Survey November 2016
Bat Survey Report July 2017
Great Crested Newt Survey Report July 2017
Sustainability Statement November 2017
Existing Site Plan Dwg 0200
Existing Elevations Dwg 0201
Existing Roof Plan Dwg 0202
Location Plan Dwg 0203
Proposed Ground Floor Plan Dwg 0310
Proposed 01 - 04 Floor Plan Dwg 0311
Proposed 05 Floor Plan Dwg 0312
Proposed Roof Plan Dwg 0313
Proposed Section AA Dwg 0330
Proposed Section BB Dwg 0331
Proposed Section CC Dwg 0332
Proposed Section DD Dwg 0332
Proposed Contextual Sections Dwg 0341
Portal Email
Communications Report
0320 Proposed North Bay Elevation
0321 Proposed East Bay Elevation
0322 Proposed West Bay Elevation
0323 Proposed South Bay Elevation
0340 Elevation Study
Energy Statement Iss 05 221117
Sustainability Statement Iss 05 201117
Design & Access Statement 21 11 2017
Travel Plan
Transport Statement
Flood Risk Assesment Report
Planning Statement Appendices
Report on Community Engagement - November 2017
Notice Article 13
consultation responses
Email from Julie Venn Morton

Print this page