Application Details
Reference number FUL/2017/2115 Application Description Full Planning Application (Major)
Coventry Reference
Site Address Jaguar Land Rover Engineering Centre
Abbey Road

Coventry
CV3 4LF
Proposal Replacement of existing surface level staff car park with multi storey decked levels and surface level staff car park. Creation of two separate surface level staff car parking area. Relocation of cycle store and associated works with temporary car parking provision during the construction period.
Application Status Consultations/Re-consultations issued
Received Date 21/08/2017 Valid date 22/08/2017
Determination Required Date 21/11/2017
Case Officer Anne Lynch Case Officer Site Visit Date
Start of Public Consultation Period 29/08/2017 End of Public Consultation Period 21/09/2017
Referred to Secretary of State Date Referral Expiry Date
Decision by Planning Committee Committee Date 16/11/2017
Decision PENDING Decision Date
Temp Permission Expiry Date Permission Expiry Date
Legal Obligation
Applicant Name
Jaguar Land Rover Ltd
Agent Name Ms Karen Jones
RPS CgMs
Applicant Address Agent Address 140
LONDON
EC2Y 5DN
Images
Application Form
Arboricultural Assessment August 2017
A summary of the attachments in the proposal
Outline Construction Environmental Management Plan August 2017
Geo-Environmental Site Investigation and Permeability Assessment Reports August 2017 Part 1
Geo-Environmental Site Investigation and Permeability Assessment Reports August 2017 Part 2
Geo-Environmental Site Investigation and Permeability Assessment Reports August 2017 Part 3
Design and Access Statement August 2017
Drainage Strategy July 2017
Ecological Assessment August 2017
How the fee was calculated
Soft Landscape Design Figure 01
Tree Survey and Protection Plan Figure 01
Flood Risk Assessment Appendix A
Flood Risk Assessment Appendix B
Flood Risk Assessment Appendix C
Flood Risk Assessment August 2017
Landscaping Statement August 2017
Letter from agent dated 17.08.17
Lighting Impact Assessment August 2017
Lighting Strategy August 2017
Planning Statement August 2017 Part 1
Planning Statement August 2017 Part 2
Ground Floor Plan Dwg RDG-XX-00-PL-A-0140 Rev E
Lighting Layout Ground and First Floor Dwg RDG-XX-00-PL-E-0100 Rev D
First Floor Plan Dwg RDG-XX-01-PL-A-0141 Rev D
Second Floor Plan Dwg RDG-XX-02-PL-A-0142 Rev D
Lighting Layout Second Floor Dwg RDG-XX-02-PL-E-0101 Rev D
Third Floor Plan Dwg RDG-XX-03-PL-A-0143 Rev D
Lighting Layout Third Floor Dwg RDG-XX-03-PL-E-0102 Rev D
Construction Details Sheet 1 of 2 Dwg RDG-XX-ST-DT-C-0503
Construction Details Sheet 2 of 2 Dwg RDG-XX-ST-DT-C-0504
Site Location Plan Dwg RDG-XX-ST-PL-A-0010 Rev C
Site Ownership Boundary Dwg RDG-XX-ST-PL-A-0011 Rev B
Ground Floor Site Plan Dwg RDG-XX-ST-PL-A-0051 Rev I
Existing Site Plan - Car Park A Dwg RDG-XX-ST-PL-A-0053 Rev A
Site Plan - Car Park A Finishes Dwg RDG-XX-ST-PL-A-0055 Rev C
Site Plan - Site Wide Car Parking Dwg RDG-XX-ST-PL-A-0060 Rev H
Site Plan - Site Wide Car Parking Dwg RDG-XX-ST-PL-A-0060 Rev H
New Gates to Scimitar Way Dwg RDG-XX-ST-PL-A-0061
Site Plan - Existing F1 Area Scope Dwg RDG-XX-ST-PL-A-0080 Rev A
Site Plan - Proposed Car Park F1 Dwg RDG-XX-ST-PL-A-0081 Rev B
Site Plan - Existing B1 Area Scope A Dwg RDG-XX-ST-PL-A-0084 Rev A
Site Plan - Existing B1 Area Scope B Dwg RDG-XX-ST-PL-A-0085 Rev A
Site Plan - Proposed Car Park B1 A Dwg RDG-XX-ST-PL-A-0086 Rev A
Site Plan - Proposed Car Park B1 B Dwg RDG-XX-ST-PL-A-0087 Rev B
Site Plan - Proposed Car Park F2 Dwg RDG-XX-ST-PL-A-0090 Rev B
Surface Water Drainage Strategy Dwg RDG-XX-ST-PL-C-0500 Rev A
Lighting Layout Surface Car Park RDG-XX-ST-PL-E-0100 Rev C
Lighting Layout Car Park B Dwg RDG-XX-ST-PL-E-0101 Rev B
Lighting Layout Car Park F Dwg RDG-XX-ST-PL-E-0102 Rev B
Lighting Philosophy and Luminaire Portfolio (A) July 2017
Elevation - North and South Dwg RDG-XX-XX-EL-A-0160 Rev D
Elevation - East and West Dwg RDG-XX-XX-EL-A-0161 Rev D
Site Section 1-1 Dwg RDG-XX-XX-SE-A-0057
Site Section 2-2 Dwg RDG-XX-XX-SE-A-0058
Existing Car Park F1 Sections Dwg RDG-XX-XX-SE-A-0082
RDG-XX-XX-SE-A-0083
RDG-XX-XX-SE-A-0088
RDG-XX-XX-SE-A-0089
Typical Cross Section - A-A Dwg RDG-XX-XX-SE-A-0130 Rev D
Cross Sections B-B and C-C Dwg RDG-XX-XX-SE-A-0131 Rev D
Long Section D-D Dwg RDG-XX-XX-SE-A-0132 Rev D
3D Views Dwg RDG-XX-XX-SK-A-8019 Rev B
3D Isometric Views Dwg RDG-XX-XX-SK-A-8020 Rev B
Stair Core Plans and Sections Dwg RDG-XX-XX-XX-A-0601
External Stair to Third Floor Dwg RDG-XX-XX-XX-A-0602
Whitley MSCP Transport Assessment August 2017 Part 1
Whitley MSCP Transport Assessment August 2017 Part 2
Travel Plan Addendum August 2017
Noise Impact Assessment August 2017
Air Quality Technical Note August 2017
Letter from agent dated 18.07.17
Portal Email
Communications Report
Site Notice
Consultation Responses