Planning Application

If the application has not been determined then you can use the 'Comment on Application' button to make representations on the proposal. For help making comments and advice on the Planning Committee process then please click on the following link how to comment.

For advice on submitting a petition then please click on the following link Petitions.

Note: If you make a comment on a planning application it will be available to view on the public file and published to the web site (with email address and phone number removed).

Plans, documents, comments and other information that forms part of the application is attached at the bottom of the page.


Application Details
Reference number OUT/2016/0405 Application Description Outline Planning Application ( Major)
Coventry Reference
Site Address Whitley South - Land to the north and south of the A45 (between the Festival and Tollbar junctions)
and land at the junctions of the A45/Festival Roundabout and the A46/Tollbar Roundabout
A45
and the junctions of the A444 with the A4114/Whitley. Roundabout

CV3 6RQ
Proposal Comprehensive development comprising demolition of existing structures and the erection of new buildings to accommodate offices, research & development facilities and light industrial uses (Use Class B1), hotel accommodation (Use Class C1), car showroom accommodation, small scale retail and catering establishments (Use Classes A1, A3, A4 and/or A5), new countryside park, ground modelling work including the construction of landscaped bunds, construction of new roads/footpaths/cycle routes, remodelling of junctions on the existing highway network, associated parking, servicing and landscaping (Outline application discharging access with all other matters reserved)
Application Status Recommendation entered - Pending decision
Received Date 08/02/2016 Valid date 08/02/2016
Determination Required Date 09/05/2016
Case Officer Anne Lynch Case Officer Site Visit Date
Start of Public Consultation Period 12/02/2016 End of Public Consultation Period 03/03/2016
Referred to Secretary of State Date Referral Expiry Date
Decision by Planning Committee Committee Date 26/04/2016
Decision PENDING Decision Date
Temp Permission Expiry Date Permission Expiry Date 00/00/0000
Legal Obligation
Applicant Name
Coventry City Council and Jaguar Land Rover
Agent Name Mr Ben Holmes
Oxalis Planning
Applicant Address Agent Address 7
Wheatcroft Business Park
Nottingham
NG12 4DG
Images
Drawings Contents
Main Contents Page
Non-Technical Summary.
Drawings Contents
General Arrangement Whole Scheme Planning Dwg:100
General Arrangement Development Roundabouts Planning Dwg:101
General Arrangement New A45 Junction Planning Dwg:102
General Arrangement Jaguar Link Junction Planning Dwg:103
General Arrangement Festival Island Planning Dwg:104
General Arrangement St Modwens Roundabout PlanningDwg:105
General Arrangement Rowley Road Junctions Planning Dwg:106
General Arrangement TollBar End Junction Planning Dwg:107
General Arrangement Jaguar Expansion Road Planning Dwg:108
General Arrangement Whitley Roundabout Planning Dwg:109
General Arrangement Stoneleigh Junction Planning Dwg:110
Highway Longsections New A45 Junction Planning Dwg:120
Highway Longsections Jaguar Link Road Planning Dwg:121
Highway Longsections Jaguar Expansion Road Planning Dwg:122
Typical Cross Sections Planning Dwg:125
Highway Junction Geometry Development Area Planning Dwg:130
Highway Junction Geometry Whitley Junctions Planning Dwg:131
Highway Junction Geometry Festival Island Planning Dwg:132
Swept Path Analyses Development Area Planning Dwg:135
Swept Path Analyses Whitley Roads Planning Dwg:136
Structures Location Plan Planning Dwg:140
Departures Plan Planning Dwg:141
Accident Reference Plan Planning Dwg:142
Drainage Strategy Planning Dwg:150
Drainage Strategy Whitley Business Park Planning Dwg:151
Drainage Strategy A45 1 of 2 Planning AO Dwg:152
Drainage Strategy A45 2 of 2 Planning AO Dwg:153
Drainage Standard Details Planning Dwg:154
A46 Slip Road Floodplain Compensation overview Dwg:001
A46 Slip Road Floodplain Compensation 100mm slice plan Dwg:002
A46 Slip Road Floodplain Compensation illustrative section Dwg:003
Impact of Proposed Bridge on Existing 100yr+cc Floodplain Dwg:004
Impact of Proposed Bridge with Mitigation in Place Dwg:104
Red Line Application Dwg:011
Cover Letter 5th February, 2016
A45 Overbridge General Arrangement A45 Span Sheet 1
A45 Overbridge General Arrangement A45 Span Sheet 2
A46 Slip Road Floodplain Compensation 100mm slice plan Dwg:0002
A46 Slip Road Floodplain Compensation illustrative section A1 Dwg:0003
A46 Slip Road Floodplain Compensation overview Dwg:0001
Abutment & Floodplain Compensation Area Locations A3 Dwg:SK03
Agriculture and Soils Report
TRAVEL PLAN
PARKING MANAGEMENT STRATEGY
TRAVEL MONITORING STRATEGY
Baseline Site Impacts & Effects Risk Matrices
Construction Impacts & Effects Risk Matrices
Operational Impacts & Effects Risk Matrices
Environmental and Geotechnical Risk Assessment Report.
Paramics Model Evaluation
Directional Signage Strategy
Junction Designs
Bridge Design
CONSTRUCTION SEQUENCE & PROGRAMME
Geometric Departures
WHITLEY SOUTH TRANSPORT ASSESSEMENT
Application Form
Landscape Framework Dwg:5.11
Landscape Framework (Detailed) Dwg:5.12
Dwg:5.13 Cross Sections A, B & C A1
Green Infrastructure Strategy
Impact of Proposed Bridge on Existing 100yr+cc Floodplain A1 Dwg:103
Impact of Proposed Bridge with Mitigation in Place A1 Dwg:104
Planning Statement
Proposed A45 Bridge Traffic Management Plan Dwg:100
Statement of Community Involvement
Environmental Statement 1-Chapter 2 Development Proposals.
Environmental Statement 1- Chapter 5 Landscape and Visual Effects
Environmental Statement 1- Chapter 6. Ecology and Nature Conservation
Environmental Statement 1 Chapter 11 Cultural Heritage
Environmental Statement - 2. Chapter 2 Development Proposals Figures
Environmental Statement\2. Chapter 6. Ecology and Nature Conservation Figures
Environmental Statement 2. Chapter 11. Cultural Heritage Figures
Environmental Statement 8. Water Resources and Drainage
Environmental Statement\13. Transportation
Environmental Statement\Chapter 1. Introduction.
Environmental Statement\Chapter 3 Planning Policy.
Environmental Statement\Chapter 4 Socio Economic Considerations
Environmental Statement\Chapter 7. Geology, Soils and Groundwater
Environmental Statement\Chapter 9. NOISE & VIBRATION
Environmental Statement\Chapter 10. Air Quality
Environmental Statement\Chapter 12. Lighting
Environmental Statement\Chapter 14. Cumulative Effects
Indicative Programme
Construction Phasing Plan
Methodology GLVIA3
Visual Effects Table revA
Great Crested Newt Report
Environmental Statement Appendix 6.7 Water vole and Otter report
Breeding Bird Survey Report
Wintering Bird Survey Report
Reptile Report
Invertebrate Report.
Flood Risk Assessment
Appendix 9. Noise and Vibration
Noise Survey April 2012 results
Location of Receiver Positions
Air Quality Glossary
Model Inputs
Model Verification
IAQM Significance Criteria Table
IAQM Highly Recommended Construction Mitigation Measures
Heritage Statement
Baseline Night Time Photographs
Lighting Effects Table
Communications Report
Appendix 01 - REPORT - Transport Assessment - Jan 2016 pt1 of 9
Appendix 01 - REPORT - Transport Assessment Jan 2016 pt2 of 9
Appendix 01 - REPORT - Transport Assessment Jan 2016 pt3 of 9
Appendix 01 - REPORT - Transport Assessment Jan 2016 pt4 of 9
Appendix 01 - REPORT - Transport Assessment Jan 2016 pt5 of 9
Appendix 01 - REPORT - Transport Assessment Jan 2016 pt6 of 9
Appendix 01 - REPORT - Transport Assessment Jan 2016 pt7 of 9
Appendix 01 - REPORT - Transport Assessment Jan 2016 pt8 of 9
Appendix 01 - REPORT - Transport Assessment Jan 2016 pt9 of 9
Topographical Survey Rev. 11
Additional (Large file size documents) available via our online document store
Consultation Responses
Letter from Electric Railway Museum dated 15.02.16
Returned Neighbour Letter
Appendix 11 - NMU Audit Report
Appendix 6 Stage 1 Road Safety Audits
Email dated 21.3.16
Additional submission documents (Large file size) Transport Appendicies, Engineering Plans & Transpor Plans 20.03.2016
Email from BWB Consulting Limited dated 29.03.16
Masterplan Showing Flood Zones Dwg WHI-BWB-EWE-XX-SK-EN-0010 Rev P1
Press Notice
Illustrative Development Plan
Officer email dated 17.04.16
Planning Committee Final Report dated 26.04.16
Late Representations 26.04.16
Planning Committee Powerpoint Presentation dated 26.04.16
Corridor Maintainance DWG:S2-P1
River Sowe A45 Bridge Crossing DWG:SK-EN-0013-S2
Floodplain Culverts Typical Details DWG:SK-EN-1003-S1-P1
Slip Road Bridge Section DWG:SK-EN-1002-S1-P2
Photograph
Email dated 20.04.16
Letter to DCLG
Draft S106 Heads of Terms
Email from agent dated 20.04.16
River Sowe A45 Bridge Crossing Dwg WHI-BWB-EWE-XX-SK-EN-0013 Rev P2
River Corridor Maintenence Dwg WHI-BWB-EWE-XX-SK-EN-0014 Rev P1
Floodplain Culverts Typical Construction Details Dwg WHI-BWB-EWE-XX-SK-EN-1003 Rev P1
Slip Road Bridge Crossing Dwg WHI-BWB-EWE-XX-SK-EN-1002 Rev P2
Site Photograph
Email from agent dated 15.04.16
BWB response to Environment Agency dated 13.04.16
Email from BWB Consulting Limited dated 14.04.16
Email from agent dated 25.04.16
Potential Adoption Plan Dwg SK13 Rev B
Secretary of State Decision re call-in
Parameters Plan
Email 13.12.2016

Print this page